Lower LCOE (for the same land area, ABC vs. TOPCon)
For the same area, the power generation is 7%+ higher than TOPCon and 15%+ higher than PERC.
The BOS cost per watt is 5%+ lower than TOPCon and 10% lower than PERC.
Lower O&M cost High temperature restriction and micro-crack resistance, front grid free, ensuring roof safety, reducing module failure rate.
The same DC capacity with connection points reduced by about 5.5%.
For the same installed capacity, a 100MW PV power station reduces the land occupation of 24500m².
Greater installed capacity for the same land area, e.g. 5.8 MW greater for 100 MW PV power station (Note: With the same product dimensions)
The company integrates advanced solar photovoltaic (PV) technologies, energy storage solutions, and smart energy management systems to power homes, businesses, and industries efficiently.